Post Offer Free
GSD Industrial Co., Ltd.  

Gold Index: 7203

You are here: home  > High Speed Coaxial Self Priming Water Pump 2 Hp For Water Circulation

High Speed Coaxial Self Priming Water Pump 2 Hp For Water Circulation 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: GMP

High Speed Coaxial Self Priming Water Pump 2 Hp For Water Circulation
 
 
<span style="color:

High Speed Coaxial Self Priming Water Pump 2 Hp For Water Circulation

 

 

Application

1) Building site water supply and drainage.

2) For irrigation.

3) Drainage for sewer and purifying tanks.

 

Features

1) High efficiency, compact design

2) Special construction for the pump casing, high self priming capability.

3) Only initial water-adding is required to save the tuouble of continously water-addings.

4) Solid-passing allowance.

5) Stable operation

6) Superior to centrifugal pump since it suction liquid mixed with air or foams and even merely air.

 

Construction

No. Accessory Name Material (GB) Material (JIS)
1 Base Q235A SS400
2 Pump body HT200 FC200
3 Plug Q235A SS400
4 Gaskets NBR NBR
5 Cover HT200 FC200
6 Impeller HT200 FC200
7 Check NBR NBR
8 Check base HT200 FC200
9 O-Ring NBR NBR
10 Seal ring ZCuSn10Pb5 Tin-Bronze
11 Bracket HT200 FC200
12 Motor - -
13 Mechanical Seal Sic-Sic Sic-Sic
14 Key 3Cr13 SUS420J2
15 Lock washer 0Cr18Ni9 SUS304
16 Impeller Nut 0Cr18Ni9 SUS304
17 Separator HT200 FC200

 

Installation of the Water Pump

1 When the installation is carried out, first check the pump body and confirm that there is no sundries.
2 Place the machine group of the water pumps on the foundation, insert iron cushion between the foundation surface and bottom surface of the base and let the water pump reach the designed levelness and elevation by adjusting the thickness of the iron cushion; increase the stability of the water pump and provide convenience for the second grouting.
3 The surface of the iron cushion must be level, the iron cushion number of each group is generally no less than 3 to 4 pieces, thick iron cushions are placed on the lower layers, the thickest one shall be clipped in the middle, and the iron cushions of the same group must be kept in order.
4 Embed the foundation bolt into the reserved hole on the foundation, check again if its direction precision is accurate, then grout adequate mortar into the space between the base and foundation concrete so as to form the structural parts of the concrete.
5 For the breakdown of the mortar, No. 400 cement matches 1:2 ~ 1:3 sand appears commonly.
6 When the water pump is installed on the vibration isolating materials such as vibration insulator or vibration isolating pad, the vibration isolating materials shall be arranged with the position of center of gravity that passes the water pump machine group as the center.
7 In order to ensure the safe running of the water pump, external loads such as pipe lines, valves, frameworks are not allowed to be born; such loads must try to be carried with the support.
8 The power line and ground line shall be connected correctly according to the connecting way marked on the name plate of the electrical machinery.
9 Each connecting bolt shall be fastened (as they may be loosened during the transport and carrying process).
10

Try to hide the electrical machinery when welding the pipe lines so as to prevent the

h

bigPhoto
 Mr. Ms. Emma Huang

Tel: 86-21-50550317
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

GSD Industrial Co., Ltd. [China (Mainland)]


Business Type:Manufacturer
City: Shanghai
Province/State: Shanghai
Country/Region: China (Mainland)

You May Like:

Product (145)