Post Offer Free
GSD Industrial Co., Ltd.  

Gold Index: 7198

You are here: home  > Centrifugal Submersible Sewage Pump Solid Handling TECO Motor High Performance

Centrifugal Submersible Sewage Pump Solid Handling TECO Motor High Performance 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: CP

Centrifugal Submersible Sewage Pump Solid Handling TECO Motor High Performance
 
 
<span style="co

Centrifugal Submersible Sewage Pump Solid Handling TECO Motor High Performance
 
 

Application:

1 Cabin ponding .
2 Waste water drainage.
3 Civil and architectural engineering construction.

 
Features:

1 Built-in leakage detector in the oil chamber can dectet leakage from the damage of the mechanical seal.
2 Built-in leakage detector in the wiring box can check if a leak in it
3 Not stamdard accessories, the power not lower than 18.5KW is optional
4 The power lower than 15KW is optional,not lower than 15KW is standard accessories.
5 the protector automatically cat off power supply to protect the bearing.(options)

 
 
Points for attention before starting equipment:

Warning:The water pump shall not be moved without putting off the power source. Humans shall not contact the water source where the pump is located when pumping water to prevent electric shock accidents in case there is no current leakage protective device while there is current leakage with the pump.

  1. Check the insulation condition of the stator winding with a 0-500V meter before starting the water pumps.

  2. Check whether the power and the voltage frequency used are in line with those listed on the label.

  3. Don't connect the electric wire of the water pump with the power source without any protective device (which may lead to the burning of the motor due to open-phase and overload). Refer to the connection method of the submersible pump. (refer to Page 9 for details).

  4. Before installation, check the rotation direction of the motor, the correction rotation direction is that the motor rotates counter-close seen from the suction direction of the impeller. If the rotation direction is not right, the connection positions of any two phases in three phases shall be shifted to get it rotate in a correct direction.

  5. Check whether the grounding wire is earthed properly.

  6. Check whether the operation of the level controller is in normal so as not to affect the service life of the submersible motor.

 

Construction:

 

No. Name Material
GB JIS
1 Neck bolt 2Cr13 SUS420
2 Heat-Protector - -
3 Motor cover HT200 FC200
4-1 Bearing - -
4-2 Bearing - -
5 Cooling house flange Q215A LSS330
6 Shaft 2Cr13 SUS420
7 Rotor - -
8 Stator - -
9 Cooling house 0Cr18Ni9 SUS304
10 Bearing cover HT200 FC200
11 Motor casing HT200 FC200
12 Bracket HT200 FC200
13 Leakage detector
bigPhoto
 Mr. Ms. Emma Huang

Tel: 86-21-50550317
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

GSD Industrial Co., Ltd. [China (Mainland)]


Business Type:Manufacturer
City: Shanghai
Province/State: Shanghai
Country/Region: China (Mainland)

You May Like:

Product (145)